Sentences Generator
And
Your saved sentences

No sentences have been saved yet

36 Sentences With "transport cost"

How to use transport cost in a sentence? Find typical usage patterns (collocations)/phrases/context for "transport cost" and check conjugation/comparative form for "transport cost". Mastering all the usages of "transport cost" from sentence examples published by news publications.

And the estimated transport cost for the tanks is $870,000, an aide told USA Today.
The transport cost nearly as much as the tuition (219,214 rand, or $225, a month for primary-school pupils).
It's not OK to buy basil that was grown in a greenhouse in Spain—the transport cost and carbon footprint is not right.
Some mountains caused a challenge, but the transport cost was fairly low, and you had this temperate zone area that extended all the way into Asia.
"The problem is to find in practice where each unit of bread should go, in such a way as to minimize the total transport cost," he wrote.
"This is cost-effective because there is no additional transport cost as the supply is being unloaded in our depot in the northern part," the BPC official said.
"We expect to be the key shipper in this project," Marek Woszczyk, the head of PGNiG's Norwegian subsidiary, told Reuters, adding the pipeline's transport cost were a key factor.
Currently, the average Medicare reimbursement for emergency air medical services covers only about 2628 percent of our transport cost, whereas Medicaid in many states reimburses at even lower rates.
Legislators and internationally active framers of distance trade, such as the World Bank and the World Trade Organization, can use this opportunity to pinpoint, develop and scale-up models that reflect transport-cost-sensitive sectors and practices.
The pipeline will carry about 500,000 barrels of oil per day, more than half of North Dakota's daily output, cutting reliance on riskier rail-cars and reducing transport cost by roughly $3 to $5 per barrel, analysts estimate.
Unfortunately, mere months later and Nintendo has once again been plagued by the same problem, with the Wall Street Journal revealing that Nintendo had to ship consoles by plane rather than boat to meet unexpected demand for the console, incurring up to $45 additional transport cost per unit.
Often in practice, because of the transport cost, gas is not actually transported but sold back into the market where it was originally bought.
The fallacies are # The network is reliable; # Latency is zero; # Bandwidth is infinite; # The network is secure; # Topology doesn't change; # There is one administrator; # Transport cost is zero; # The network is homogeneous.
Greenlandic fleece is dual-coated. When the long and finer coat is separated, the outer and inner coats are used for different woolen products. Though the transport cost has up to now stopped all industrial use of the Greenlandic wool.
In 1950, the prices were DM 3475 for the smallest flatbed, DM 4300 for the estate, and the "special carriage for livestock transport" cost DM 4805; a heater was a DM 65 extra, hydraulic brakes cost an additional DM 115.
Eight million died in the Potosi Mines the vast, vast majority being Native American slaves brought from all over the Americas. A relatively small number of African slaves, though due to high population density of Natives and transport cost of African slave, their numbers remained low unlike the Carribean islands.
It is transported to the oil-producing fields through a large network of over of pipelines. The use of for enhanced oil recovery (EOR) methods in heavy oil reservoirs in the Western Canadian Sedimentary Basin (WCSB) has also been proposed. However, transport cost remains an important hurdle. An extensive pipeline system does not yet exist in the WCSB.
Flint & Pere Marquette Railway superintendent William L. Mercereau authorized Logan's all steel transport cost of $400,000. It was claimed to be one of the fastest boats on Lake Michigan. The first No. 18 sank to the bottom of Lake Michigan with 31 people perishing out of its 64 crew members. A second No. 18 was built in 1911.
The last generalization is considered to be wrong because he never takes into account terminal costs and therefore is considered biased toward intermediate locations. To further explore the location of firms Weber also created two concepts. The first is of an isotim, which is a line of equal transport cost for any product or material. The second is the isodapane which is a line of total transport costs.
Shiozawa, based on much more general model, succeeded in giving a new explanation on why the traded volume increases for intermediates goods when the transport cost decreases. "New" new trade theory (NNTT) also needs new theoretical foundation. Melitz and his followers concentrate on empirical aspects and pay little interest on theoretical aspects of NNTT. Shiozawa's new construction, or Ricardo-Sraffa trade theory, enables Ricardian trade theory to include choice of techniques.
The Irwell and Mersey were made navigable by 1736, opening a route from Manchester to the sea docks on the Mersey. The Bridgewater Canal, Britain's first wholly artificial waterway, was opened in 1761, bringing coal from mines at Worsley to central Manchester. The canal was extended to the Mersey at Runcorn by 1776. The combination of competition and improved efficiency halved the cost of coal and halved the transport cost of raw cotton.
There is no government-owned public transportation in Zanzibar. The privately owned Daladala, as it is officially known in Zanzibar, is the only kind of public transportation. The term Daladala originated from the Kiswahili word DALA(Dollar) or five shillings during the 1970s and 1980s when public transport cost five shillings to travel to the nearest town. Therefore, travelling to town will cost a Dollar(“Dala”) and returning will again cost a Dollar, hence the term Daladala originated.
In the absence of funding constraints, the best value for money projects are those with the highest net present value (NPV). Where there is a budget constraint, the ratio of NPV to the expenditure falling within the constraint should be used. In practice, the ratio of present value (PV) of future net benefits to expenditure is expressed as a BCR. (NPV-to-investment is net BCR.) BCRs have been used most extensively in the field of transport cost–benefit appraisals.
Most of the visitors were foreign tourists as the high transport cost to this remote location is less affordable for local visitors. The park can accommodate up to 60,000 visitors a year according to the local tourism agency.The Jakarta Post: Komodo Park attendance up by 9,000 in 2010, 24 July 2011 Several types of boat tours run through the national park including upscale scuba liveaboards, short daily snorkel trips and 4 day, 3 night 'tourist boats' between Lombok and Flores.
Copper ore had to be transported by ox wagon from the mines around O'okiep to the harbour at Port Nolloth on the West Coast. The poor roads through mountainous areas hindered development of the mines and the already high transport cost was often aggravated by droughts and animal sickness. This eventually led to the decision by the mining company to build a light railway between the port and the mines, on advice from civil engineer R. Thomas Hall, Superintendent of the narrow gauge Redruth and Chacewater Railway in Cornwall.The South African Railways - Historical Survey.
There were different forecasts of freight transport volumes, from which benefit–cost ratio could be derived. In 1981, a Federal Minister for Transport cost–benefit account assumed an estimated traffic volume of only 2.7 million tonnes per year for the Main-Danube Canal, and a benefit–cost ratio of 0.52:1. This might have justified the termination of the project. One of the proponents commissioned a study by the Ifo-Institut München, predicting an estimated 5.5 million tonnes per year for the traffic volume on the Main- Danube Canal.
Lena River. Irkutsk is near Lake Baikal Food passing through Okhotsk was mostly grown near Irkutsk and floated down the Lena River to Yakutsk, carried to Okhotsk and from there most went by ship to Kamchatka. European goods and travelers joined the Lena at the Ust-Kut portage. Lighter west-bound goods -mostly furs- took the reverse route. After 1729 most furs were sold to the Chinese at Kyakhta. In 1805 a pood (34 pounds) of flour cost 0.5 rubles at Irkutsk, 1.5 rubles at Yakutsk, 10 rubles at Okhotsk and 12 rubles at Kamchatka, the difference being the transport cost.
The tournament was contested in Jaguariúna, São Paulo state on its first year (2006) and in multiple towns of Rio de Janeiro state on its second year (2007). In 2007, CBF created the Copa do Brasil de Futebol Feminino, a national cup competition and in 2013 a national short tournament league was founded, the Campeonato Brasileiro de Futebol Feminino with its current format, with a short three month season. In 2015, teams at least in the knock- out rounds got about USD 3,000 for a home and away leg plus air or road transport cost paid.
There have been some market-led initiatives to encourage packaging reuse by companies introducing refill packs of certain commodities (mainly soap powders and cleaning fluids), the contents being transferred before use into a reusable package kept by the customer, with the savings in packaging being passed onto the customer by lower shelf prices. The refill pack itself is not reused, but being a minimal package for carrying the product home, it requires less material than one with the durability and features (reclosable top, convenient shape, etc.) required for easy use of the product, while avoiding the transport cost and emissions of returning the reusable package to the factory.
A huge difference from the previous investing rate, which was as low as 2% of the GDP. Same study has also found that during their research period, the Metro Manila traffic was costing the city and the people Php 2.4 billion per day in the year 2012. And, if no measures are undertaken, this transport cost can rise up to Php 6.0 billion per day in 2030. This is will be worst-case scenario in the increase of transport costs in Metro Manila and the areas of Bulacan, Rizal, Laguna, and Cavite if there will be no improvements done on the transport infrastructure of these areas and the Philippines overall.
Transport cost savings are estimated at more than US$1,000 per FEU (forty-foot equivalent container). The San Juan river is 200 kilometres long. The total waterway length from a lakeport in the vicinity of Granada/Tipitapa on the northern shore of the Lake of Nicaragua, to the outlet of the San Juan river at San Juan del Norte, is some 360 kilometres. The principal obstacles to navigation are six sets of rapids along the river, and sand bars in shallower parts of the river. Average channel depth in the river during the dry season is around six feet (1.83m), with variations from around one foot (0.30m) to over 30 feet (9.14m).
The railway that opened in September 1825 was long and ran from Phoenix Pit, Old Etherley Colliery, to Cottage Row, Stockton; there was also a branch to the depot at Darlington, of the Hagger Leases branch, and a branch to Yarm. Most of the track used malleable iron rails, and of cast iron rails were used for junctions. The line was single track with four passing loops each mile; square sleepers supported each rail separately so that horses could walk between them. Stone was used for the sleepers to the west of Darlington and oak to the east; Stephenson would have preferred all of them to have been stone, but the transport cost was too high as they were quarried in the Auckland area.
In emergency cases, network hospital can give telephonic intimation to the NIC and approval can be granted immediately. Once the patient is admitted, all expenses pertaining to the patient are borne by the hospital and thereafter the hospital sends bill to the insurer NIC for reimbursement. These expenses include bed charges in general ward, nursing and boarding charges, fees of doctors involved in the treatment (surgeons, anaesthetists, medical practitioner etc.), consultants fees, cost of anaesthesia, blood bottles, oxygen, operating theater charges, cost of surgical appliances, medicines and drugs, cost of prosthetic devices, implants, X-Ray and diagnostic tests, food to inpatient, one side transport cost (from Hospital to residence of patient only by bus or railway. The scheme does not cover ambulance charges for transporting patient from home to hospital or from one hospital to another hospital.) etc.
Since the 1980s, the Indian and Bangladeshi governments have sought to negotiate an agreement permitting commercial vehicles to pass through Bangladeshi highways to reach the northeastern states of India from the west; a concept described in India as the "Bangla Corridor." Such an arrangement is being promoted for its benefit to bilateral commerce, the transport cost reduction for Indian businesses and additional revenue for Bangladesh. In 2006, both governments began working on a proposal to provide a bus service directly connecting Kolkata with Agartala, the capital of the Indian state of Tripura, which borders eastern Bangladesh. As of 2007, travelling distance through Indian territory is an estimated , but a direct road link via Dhaka would shorten the travelling distance to an estimated , considerably reducing the costs of transport for Indian businesses, which have to transport goods and services through the narrow "Chicken's Neck" territory that is bordered by northern Bangladesh and southern Nepal.
The company which operates both of the motorways claimed that the average price of the A1 motorway was 7.1 million euro per kilometer and that the average cost per kilometer of the A11 stands at 11.3 million euro, further citing high transport cost of the backfill material caused by remote location of the closest quarry which is approximately away. Construction of the A11 motorway was also criticized as an example of interference of politics in road construction, where construction sites are perceived as generally serving as ribbon-cutting ceremony sites during election campaigns. In April 2010, the entire A11 motorway route between Zagreb bypass and Sisak, at the time with the planned length of , was planned to be completed within two and a half years, at a cost of 5.1 billion kuna (689 million euro). Construction works on the Buševec-Lekenik section commenced in April 2010, when completion of the section was announced for 2011.
As of 2016 when publicly discussed, SpaceX the company is concentrating its resources on the transportation part of the overall Mars architecture project as well as an autonomous propellant plant that could be deployed on Mars to produce methane and oxygen rocket propellants from local resources. If built, and if planned objectives are achieved, then the transport cost of getting material and people to space, and across the inner Solar System, will be reduced by several orders of magnitude. SpaceX CEO Elon Musk is championing a much larger set of long-term Mars settlement objectives, ones that take advantage of these lower transport costs to go far beyond what the SpaceX company will build and that will ultimately involve many more economic actors—whether individual, company, or government—to build out the settlement over many decades. In addition to explicit SpaceX plans and concepts for a transportation system and early missions, Musk has personally been a very public exponent of a large systemic vision for building a sustainable human presence on Mars over the very long term, a vision well beyond what his company or he personally can effect.

No results under this filter, show 36 sentences.

Copyright © 2024 RandomSentenceGen.com All rights reserved.