Sentences Generator
And
Your saved sentences

No sentences have been saved yet

81 Sentences With "supplied power to"

How to use supplied power to in a sentence? Find typical usage patterns (collocations)/phrases/context for "supplied power to" and check conjugation/comparative form for "supplied power to". Mastering all the usages of "supplied power to" from sentence examples published by news publications.

At night, we charged our phones with generators that also supplied power to radios used to communicate with men throughout the area.
A transmission line that supplied power to both islands was severed when "PCL Construction, the company building Bonner Bridge, accidentally drove a steel casing" into an underground transmission cable run by the Cape Hatteras Electric Cooperative, the statement said.
Gaza was already chronically short of electricity before West Bank-based Palestinian President Mahmoud Abbas cut payments for Israeli-supplied power to the territory in June, attempting pressure the rival Islamist Hamas group to relinquish control of the Gaza Strip.
It supplied power to three residences, a blacksmith shop, and a funicular railway.
The Russian Science Power Platform would have supplied power to the Russian Orbital Segment independent of the ITS solar arrays.
In January 1953 the railway power station at Lithgow, that supplied power to Bathurst was taken over by the Electricity Commission of New South Wales and interconnection of power systems to increase reliability occurred.
Also there was a 700-Volt D.C. Dynamo which supplied power to the lathes refrigerator for the Cold Room where fruit from the orchard was stored.Daniel, C. Newberry Contribution from South Africa. RootsWeb, 1999.
The engine house supplied power to the New York City Subway's Fourth Avenue Line, formerly operated by the BMT, until 1972 when the New York City Transit Authority sold it to the government of New York City.
A Napier MS100 turbocharger was fitted to each engine. An English Electric Type 824/1B generator was driven by the diesel engine. It had a continuous rating of , 600A at 550V. This supplied power to the traction motors.
He installed the wheel on McWay Creek in 1932. The undershot wheel ran a 32-volt generator and was the first electric power in the Big Sur area. It supplied power to three residences, a blacksmith shop, and the Funicular railway.
A diesel generator supplied power to the appliances. The dining cars, the largest single-unit dining cars ever built, weighed and rode on six-wheel trucks. As Superliner dining cars arrived in the 1980s, Amtrak rebuilt these cars as diner-lounges, incorporating booths and lounge seating.
Lighting was supplied from a 110 V circuit which was fed by the generator in parallel with lead acid batteries. The batteries were mounted in cases suspended underneath the locomotive body between the bogies. This generator also supplied power to the control circuits, exhauster, compressor and cab heaters.
In this arrangement, the boat's four main diesel engines drove only electric generators, which supplied power to high-speed electric motors geared to the propeller shafts. The engines themselves were not connected to the propeller shafts. For submerged propulsion, massive storage batteries supplied electricity to the motors. Problems arose with flashover and arcing in the main electric motors.
One drawback was the battery box that supplied power to the rails. The configuration of the interior of the box lid resembled a small upturned plastic stool. When one twisted the directional control atop the battery box, the "stool" inside turned and made the contacts touch. After repeated use, the "legs" of the stool broke off, and the box was useless.
Hussain Sagar Thermal Power Station was built in the year 1920 by the 7th Nizam Mir Osman Ali Khan on the banks of Hussain Sagar lake. It was the first thermal power station of South India.Hussain Sagar Lake - 450+ years old Man made Lake It supplied power to the twin cities of Hyderabad and Secunderabad from the year 1920 to the year 1983.
A Hewland 5-speed manual transaxle was mounted at the rear and supplied power to the rear wheels only. The car was also fitted with a dual-plate, Formula-One type Borg & Beck clutch. Double wishbone suspension and coil springs were used at all four wheels, with suspension geometry based on the Ferrari Mondial. Some standard 308 and Mondial components were incorporated, although many were modified.
They were used on the IC system. As a result, the IC supplied power to the City of Miami from Chicago to Miami and in the mid-1960s on the Seminole between Chicago and Columbus, Georgia. These engines were returned to the CofG after Amtrak came into being, but were retired from service. The Dixie Flagler was originally steam powered with each railroad supplying their own power.
The sails span 74 feet 4 inches. The brake wheel, located in the cap, rotates an upright shaft running the height of the mill. This shaft supplied power to all of the mill's operations. There is a set of belt-driven elevators, remarkable for its time, that moved the grains from chutes to hoppers, and even from floor to floor, making the mill almost fully automatic.
In the 1920s, steelworkers moved into the area, taking advantage of the proximity to the fledgling BHP works. The Carrington Pump House, pictured, supplied power to a series of cranes which operated along 'The Dyke' loading ships with coal and other freight.Letter of Ken McCarthy, published in Australian Railway Historical Society Bulletin, May 1978, pp. 103–110 This is probably the most significant surviving building from Newcastle's nineteenth century industrial past.
Chaudhry Shujaat Hussain Becomes Prime Minister - The story of Pakistan In October 2012, TERI—a research institute from India set up a mini grid of solar power as a mark of goodwill to Singh. The mini grid supplied power to 51 families in the village and water heaters of three mosques. A former chief minister of Madhya Pradesh was born in Gah in 1920. He was an MLA from Indore.
Hans Ewoldsen, the Saddle Rock Ranch foreman, built a Pelton wheel on McWay Creek in 1932. He worked in the machine shop of the highway construction crew, using hand-split redwood from the canyon and other materials he bought. The undershot wheel ran a 32-volt generator and was the first electric power in the Big Sur area. It supplied power to three residences, a blacksmith shop, and the Funicular railway.
The spring was used to power a gristmill from the times of the earliest European settlement. The Mammoth Spring Milling Company constructed a dam and a water-powered gristmill just downstream of the outlet of the spring lake. In 1925, the dam was purchased by the Arkansas-Missouri Power Company which constructed a hydroelectric plant at the dam. This plant supplied power to the surrounding area until 1972.
None of them entered production. The 1973 Enfield 8000 did make it into small-scale production, 112 were eventually produced.In 1967, AMC partnered with Gulton Industries to develop a new battery based on lithium and a speed controller designed by Victor Wouk. A nickel-cadmium battery supplied power to an all-electric 1969 Rambler American station wagon. Other "plug-in" experimental AMC vehicles developed with Gulton included the Amitron (1967) and the similar Electron (1977).
The Qajars were one of the original Turkoman Qizilbash tribes that emerged and spread in Asia Minor around tenth and eleventh centuries. They later supplied power to the Safavids since this dynasty's earliest days. Numerous members of the Qajar tribe held prominent ranks in the Safavid state. In 1794, a Qajar chieftain, Agha Mohammed, member of the Qoyunlu branch of the Qajars, founded the Qajar dynasty which replaced the Zand dynasty in Iran.
In the early 1871s Belgian inventor Zénobe Gramme invented a generator powerful enough to produce power on a commercial scale for industry. In 1878, a hydroelectric power station was designed and built by William, Lord Armstrong at Cragside, England. It used water from lakes on his estate to power Siemens dynamos. The electricity supplied power to lights, heating, produced hot water, ran an elevator as well as labor-saving devices and farm buildings.
Airways Park, the head office of South African Airways Spartan is a large industrial zone which houses many chemical manufacturing and other industrial sites. North-west of Kempton Park lies the heavy industry suburb of Modderfontein with one of the main companies there, the AECI Dynamite factory. Kempton Park also has a large coal power station named Kelvin power station which supplied power to the City of Johannesburg. The Emperor's Palace Casino is also located in Kempton Park.
Boiler Room. The entire complex that makes up the Tejo Power Station constitutes an old thermoelectric plant that supplied power to Lisbon and its surrounding area. The building is unique amidst Lisbon's architectural setting, and is one of the most beautiful examples of Portuguese industrial architecture from the first half of the 20th century.SANTOS, António, "Arquitectura de Tijolo e Indústria - A introdução de Tijolo Sílico-Calcário em Portugal (1903-1913)", in Revista Arqueologia & Indústria, (1), pp.
Water exited the Wellington wheel pit to the exterior breastshot Waterloo wheel which was in diameter but narrower. Power was transmitted to the mill and outbuildings through a tunnel. As the tail race was lower than the River Goyt, at water went via a tunnel further downstream to where which time the river had dropped sufficiently in height. A further water wheel is known of that supplied power to stone built corn mill off the south western gable of the mill.
Spencer Street Power Station was a Victorian era coal and (later) oil-fired power station which operated on Spencer Street in central Melbourne, Victoria, Australia. The station was opened in 1892, and supplied power to the city's residents, as well as being a wholesale supplier to other municipal distributors. It came under the management of the State Electricity Commission of Victoria in 1941. By the 1960s the capacity of the station reached 109 MW, but was used only for peak load.
This resulted in an 8.5-mile long overhead 11 kV transmission line being constructed and commissioned in 1955. This not only supplied power to the chateau but also to the Whakapapa ski field and to several mountain huts on Mount Ruapehu.Reilly. Pages 85 and 86. In the early 1960s a second line was constructed and commissioned in 1964 by the King Country Electric Power Board to improve the reliability of supply to the Chateau and to other customers in the area.Reilly.
He stated at the Board of Trade Inquiry into the accident that the reason for this practice was a desire to save the expense connected with the wear of the batteries that supplied power to the tablet instruments. This was achieved by suspending tablet working until 9 o'clock in the morning, as, prior to that hour, there was only one engine in steam in use on the line, and the suspension of tablet working enabled the batteries to be overhauled and cleaned.
Maqsud Sultan Kangarlu was a Safavid military commander during the reign of king Abbas I (r. 1588-1629), who also served as the governor of Nakhchivan from 1605 to 1630. Maqsud Sultan was a member of the Kangarlu branch of the Turkoman Ustajlu tribe, one of the original Qizilbash tribes that had supplied power to the Safavids since its earliest days. He played an important role in the mass relocation of the empire's Armenian subjects in the early years of the 17th century.
Keep Off. Only Government permitted within 200 yards" sign lay in front of the powerhouse to deter people landing on the island at the point. The power house is located on the front left of the picture with the white tower Between 1939 and 1963 it supplied power to the Federal Penitentiary and other buildings on the island. The powerhouse had a tower duty station which was guarded with a "30-caliber Winchester rifle with 50 rounds of ammunition, a Colt .
The British coastguard in Falmouth co-ordinated international efforts to get appropriate medicines to Tristan to treat the virus. Tristan's elderly population and the very young were most at risk; however, only four elderly people were hospitalised. Royal Fleet Auxiliary Vessel RFA Gold Rover upon reaching the island with the required medical supplies found no emergency and the islanders in good general health. On 13 February 2008, fire destroyed the fishing factory and the four generators that supplied power to the island.
The arrangement made the facility the world's first underwater hydroelectric plant. In its original plan, the plant was meant as an independent competitor to the local electric companies, and supplied power to the surrounding towns of Illchester, Ellicott City and Catonsville many of which were outside of the utilities' service area. It replaced an earlier 300 hp plant purchased for $12,000 in 1900 two miles away at Gray's mills that employed a millrace with a bevel gear and rope drive.
To transmit this power to the rail Brush utilised a brushless salient poleSalient-Pole Machines General description of salient pole machines as both motors and generators mysite.du.edu three phase alternator connected to a rectifying circuit of 84 silicon diodes producing ~2,500 kW of power for electric traction from the diesel engine. An auxiliary alternator, also brushless and producing three phase electrical power gave ~500 kW for electrical train heating, and also supplied power to electrical fans etc. in the locomotive.
Tagus River (Rio Tejo). The Tejo Power Station was a thermoelectric power plant owned by the Companhias Reunidas de Gás e Electricidade (CRGE – United Gas and Electric Companies), which supplied power to the city and entire Lisbon region. It is located in the Belém district of Portugal's capital and its activity spanned from 1909 to 1972, although as of 1951 it was used as a reserve power station. Over time, it underwent several adjustments and expansions, going through many different phases of construction and production.
When the mill was working, 8 million gallons of water flowed through per day. When the mill was worked by the Larter family in the 1920s, the deeds stated that anyone interfering with the river had to pay dues to the millers. The Larter family also used the mill to generate electricity, which also supplied power to some of the surrounding properties including a Bell's grocery shop, Larter & Rudran's bicycle garage and a property at The Dell. The mill burnt down in November 1956.
However, the tree has not lost its power. This was because, during his battle with Ryōko, Yōshō had stolen the three gems originally bonded by Washu and bonded them to the pommel of Tenchi-ken (which was created from the wood of the Tsunami tree). As a result, the gems had supplied power to the tree for over 700 years, countering the usual consequences of a Juraian Space Tree taking root and prolonging his lifespan. He is in a common law marriage with Airi and has two children from that union called Minaho and Kiyone.
The high tension switchgear and 1100 KVA transformer have been removed. The upper level has a concrete platform, supported on brick piers, where the rotary converter was located. The original location of the relay panel can be seen against the south wall, and the control and feeder panel against the east wall which supplied power to the feeder cables located either end at the top of the east wall. A toilet cubicle is located in the southeast corner of the space, over which an air compressor was once situated.
Two more Parsons 25 MW machines (No7 and No8) were added by 1956. Steam for machines 5–8 was supplied by four high-pressure Babcox and Wilcox pulverized coal boilers. This doubled the generation capacity of the plant, bringing it to 126.2 MW. The original station was a private facility, owned by the Electric Light and Power Supply Corporation (EL&PSC;), which supplied electricity to consumers and businesses in Balmain, Leichhardt, Ashfield, Newtown and Petersham. It also supplied power to large enterprises in the local area including Mort's Dock and the Balmain Colliery.
The strike mostly ended in late August when the TCC reopened the mines and the NLRB rejected a petition by the AFL for a third vote. Members of the IUMMSW gradually returned to work, but continued to demand that the TCC join the IUMMSW, and the conflict continued. On April 1, 14, and 24, 1940, a total of six explosions, perpetrated by striking miners, damaged three separate transmission lines operated by the Tennessee Valley Authority (TVA) that supplied power to the basin, briefly cutting power to the basin and forcing the closure of the mines.
The Evarts subclass had diesel-electric machinery, based on an arrangement used for submarines. There were two shafts. Four Winton 278A 16-cylinder engines, with a combined rating of , drove General Electric Company (GE) generators (4,800 kW) that supplied power to two GE electric motors, with an output of , for a speed of . It had been intended to provide another set of this machinery for an output of , to make the design speed of , but hull production greatly outstripped that of the machinery; therefore, only one set of machinery was used per ship.
It supplied power to concealed four-beam headlights, parking/marker lights, brake lights, backup lights, instrument lights, electric windshield wipers, a single-speed heater blower, and a radio/public address system. With this equipment, the Boilermaker Special III was capable of day or night operation on most improved roads, including highways. The original headlight from Boilermaker Special I was installed on the back of the coal tender as a rear-facing safety light. It was later removed and installed as the headlight of the Boilermaker IV in 1979 (see below).
The core of the stack was a pressurized compartment called the Orbital Compartment. This part housed the spacecraft's control electronics, radio transmitters and receivers, batteries, astro-orientation equipment, and so on. The compartment was pressurized to around 100 kPa and thermally controlled to simulate earth-like conditions, which removed the need for special electronic components that could reliably operate in extreme conditions (on Zond 1 the module depressurized in flight, severely damaging the probe's systems). Mounted on the outside of the Orbital Compartment were two solar panels which supplied power to the spacecraft.
The Sherman Creek Generating Station was a coal-fired power plant built by the United Electric Light and Power Company in New York City, on Manhattan Island at 201st Street and the Harlem River. The station supplied power to many customers, including the New York, New Haven and Hartford Railroad via the West Farms Substation. The station site was bounded by 201st Street to the north, the Harlem River to the East, and Sherman Creek to the South. United Electric Light and Power was later absorbed into Consolidated Edison, and the station was demolished.
Herbert Lloyd Pinches now took over and, taking a cue > from the way the ropeway and the pioneering Munnar Factory were powered, he > started the Munnar Valley Electric Works, which supplied power to nine > factories within a radius of six miles. This was the first electric power > supplied for tea manufacture in India. In time, much of the High Range would > get its power from the MVEW grid. By 1924, Pinches had ensured that most of > the kanan Devan property had been cleared and developed, though development > continued till 1932.
A 2,300 bhp Sulzer 12LDA28-A diesel engine drove a Crompton Parkinson GC426-A1 main generator which supplied power to six Crompton Parkinson C171-B1 traction motors. When initially put into service, the locomotives were fitted with multiple working. They were geared for 90 mph running, although D2 was experimentally geared to run faster than this and was also fitted temporarily with the first intercooled 2,500 bhp B model of the engine. In 1962 it managed 110 mph with three coach test trains on the West Coast Main Line.
As of the earliest years of the 20th century, the local paper mill was operated by International Paper and Wilder boasted a railroad station, a post office, several retail stores, and electric street lighting. An iron bridge contributed by Charles Wilder spanned the Connecticut River at Wilder. The bridge, the paper mill, and the dam that supplied power to the mill were all demolished in 1950 for the construction of Wilder Dam. The Wilder Village Historic District was listed on the National Register of Historic Places in 1999.
This generator also supplied power to the gyro motors and the air compressor. The balancing system used a pneumatic servo, rather than the friction wheels used in the earlier model. The gyros were located in the cab, although Brennan planned to re-site them under the floor of the vehicle before displaying the vehicle in public, but the unveiling of Scherl's machine forced him to bring forward the first public demonstration to 10 November 1909. There was insufficient time to re- position the gyros before the monorail's public debut.
They successfully landed the plane at another airport and escaped. Before the Sterling Hall bombing, Karl committed several other acts with anti-war sentiments, including setting fire to a ROTC installation at the University of Wisconsin Armory and Gymnasium (the Red Gym) and one meant for the state Selective Service headquarters which instead held the University of Wisconsin Primate Research Center. Karl also attempted to plant explosives at a Prairie du Sac electrical substation that supplied power to the ammunition plant, but was frightened off by the night watchman.
The plant was built near the Comal Canal, which was the main source of water to cool the turbines and generators. Power was derived from fuel-burning steam generators, it was not a hydroelectric plant. The Comal Power Plant supplied power to central Texas, as well as several nearby military bases, particularly during World War II when the plant was temporarily under the direction of the United States War Department. The plant was designed to use lignite, a low energy form of coal that, while relatively inexpensive, required special shipping and processing to use as a fuel source.
Bromborough power stations are three electricity generating stations that supplied power to industrial and domestic users in Bromborough, Port Sunlight and the wider Wirral area from 1918 until 1998. Bromborough power station provided public electricity supplies from 1951 to 1980. Central power station Bromborough (1918–1998) was originally owned by Lever Brothers and supplied electricity to domestic users in Port Sunlight as well as electricity and steam to industrial users. Merseyside power station Bromborough (1958–1998) was also owned by Unilever and provided electricity and steam at a range of pressures to industrial users in the locality.
The forward-most engine room powered the starboard outer shaft, the second turbine drove the outer screw on the port side, the third engine supplied power to the inner starboard propeller, and the fourth turbine drove the port-side inner screw. All four screws had four blades; the two outer propellers were in diameter and the inner pair were wide. Steering was controlled by a pair of rudders. At the time of their commissioning, the ships had a top speed of , though by 1945, with the addition of other equipment, such as anti-aircraft weaponry, their maximum speed was reduced to .
Buyers also had to secure their own water via rain tanks and wells; sewerage was disposed of through septic tanks. It wasn't until around two years later that the State Electricity Commission supplied power to Madora Bay. Over upcoming years, the estate changed in various ways, the biggest possibly being the change of name from Madora Beach to Madora Bay in 1970; this was done through a marketing perspective as the name seemed more appealing to tourists. Madora Bay has now been subdivided into 650 lots and in 2002, development commenced to add another 400 lots to the suburb.
During the 1970s, several of the original converter or power stations which originally supplied power to the system were shut down. Also the end of electrified through-freight service on the Main Line to Paoli allowed the original 1915 substations and their 44 kV distribution lines to be decommissioned with that section of track being fed from 1930s-era substations on either end. In the decade between 1992 and 2002, several static converter stations were commissioned to replace stations that had or were being shut down. Jericho Park, Richmond, and Sunnyside Yard converters were all installed during this period.
Unlike most towns during the depression years of the 1930s, Cornwall was facing industrial expansion and population growth, increasing the demand for more power by three-hundred percent. Cornwall Electric would now obtain all its power from St. Lawrence Power, which received its power from the Cedars Rapids Transmission Co. Ltd., which primarily supplied power to its then parent company, the Aluminum Company Of America (ALCOA) which operated an aluminum smelter located near Cornwall in Massena, New York. Under an 85-year contract that extended to the year 2000, Cedar Rapids agreed to purchase 56,000 kW of power from Hydro-Québec, and if available, could purchase an additional 50,000 kW.
Faced with being overrun, Gategood withdrew his force even further, at first back to Taleba Bay, and then to Mud Bay aboard Stuart, arriving on 24 October. alt=A man in a slouch hat looks out from a sailing ship over a mountainous coastline. Gategood could not get through on the radio because the petrol generator that supplied power to the radios at Mud Bay had broken down, thereby cutting Arnold's link with Mud Bay, Milne Force and Taleba Bay. Arnold launched an attack on Kilia at 09:10, supported by two 3-inch mortars and 100 rounds that had been brought up from Mud Bay.
Railroad tunnel, from a postcard sent in 1905 In the early 19th century, several small industries developed along the town's rivers, which supplied power to the water wheels of shops and mills. Hat making was an early industry, but the several small shops that developed were put out of business by the 1880s by the larger, more efficient factories in Danbury and Bethel. Cruson, Daniel, "Newtown in the Nineteenth Century", Web page/article at the Newtown Historical Society Web site Button and comb production thrived until the late 19th century. Both buttons and combs were made from the horns, bones and hooves of animals, all plentiful in an agricultural town.
A bank of lead-acid batteries in glass jars both supplied power to illuminate lamps, as well as to start an engine to recharge the batteries. Battery storage technology is typically around 80% to more than 90% efficient for newer lithium ion devices. Battery systems connected to large solid-state converters have been used to stabilize power distribution networks. Some grid batteries are co-located with renewable energy plants, either to smooth the power supplied by the intermittent wind or solar output, or to shift the power output into other hours of the day when the renewable plant cannot produce power directly (see Installation examples).
The Northern City Line had previously been served by surface stock, and had to be modified to accommodate the Standard Stock. Additionally, it had a non-standard arrangement of the third and fourth rails which supplied power to the cars, and these were modified to the same configuration as on the Northern line during the refurbishment. The use of control trailers at one end of a short train was virtually discontinued during the 1930s, because of the risks of disruption to services. A 3-car train consisted on a driving motor car, a trailer and a control trailer (DM-T-CT) and only had one compressor on the motor car.
Some sections of tramway track still have the slot rails visible. A third rail supplied power to the world's first electric underground railway, the City & South London Railway, which opened in 1890 (now part of the Northern line of the London Underground). In 1893, the world's second third-rail powered city railway opened in Britain, the Liverpool Overhead Railway (closed 1956 and dismantled). The first US third-rail powered city railway in revenue use was the 1895 Metropolitan West Side Elevated, which soon became part of the Chicago 'L'. In 1901, Granville Woods, a prominent African-American inventor, was granted a , covering various proposed improvements to third rail systems.
Boone was a division and crew change point on the railroad under the Chicago & Northwestern and some of that business remains today. There is a moderate-sized rail yard to the east of the downtown area. The locomotives no longer sound their horns in the town proper due to modifications to the various points where streets intersect with the rail line. Boone was also the exact midpoint on the Fort Dodge, Des Moines & Southern Railroad, an electric interurban line converted to diesel in 1955 after a flood on the Des Moines River devastated the Fraser hydroelectric power plant that supplied power to the railroad.
Since its creation in February 2005, the SFPUC Power Enterprise Division has supplied power to many city facilities including Muni, San Francisco International Airport as well as the Modesto and Turlock Irrigation districts. The SFPUC also administers and operates CleanPowerSF, a Community Choice Aggregation program within the guidelines of California State law. The SFPUC is also the water, full retail electricity service, and wastewater utility for occupants of Treasure Island and Yerba Buena Island. The SFPUC manages an extensive wastewater system that collects, conveys, and provides secondary treatment to combined sewage flows (both stormwater and sewage) within the City & County of San Francisco before discharging it into the San Francisco Bay and the Pacific Ocean.
In 1995, Canadian National Railways decided to close the Northern Algonquin line to rail traffic, stating that operational costs were too high. As part of the closure the Brent rail yard was dismantled along with the yards' twin 125 KW generators that supplied power to Brent. Brent is too remote to be connected to the main hydro power grid so the remaining dwellings requiring power use either generator, solar or use no power at all. The Brent village at its peak, circa 1930, had a school house, hotel, restaurant, post office, train station, round house, coal tower, water tower, saw mill and houses to accommodate around 200 people both railway and saw mill employees.
California's single remaining operational nuclear power plant, Diablo Canyon Power Plant, accounts for less than one-tenth of total generation. California used to have multiple other nuclear power plants, including the Rancho Seco Nuclear Generating Station, the San Onofre Nuclear Generating Station, the Vallecitos Nuclear Center, and the Humboldt Bay Nuclear Power Plant, in addition to various other smaller experimental or prototype reactors which intermittently supplied power to the grid, such as the Sodium Reactor Experiment. However all of these reactors have been shut down due to both economic and social factors. Currently, the owner of the Diablo Canyon plant, Pacific Gas & Electric, has plans to shut down the two reactors at the site in 2025.
The railway was eventually opened for traffic in 1909 and even had 1st and 2nd class accommodation. When Buchunan left in 1911, Kanan Devan had grown to over 11,500 acres, while Anglo – American had over 1500 acres under tea; there were only about 3000 acres held by others, much of which was eventually to be taken over by Malayalam Plantations. Herbert Lloyd Pinches now took over and, taking a cue from the way the ropeway and the pioneering Munnar Factory were powered, he started the Munnar Valley Electric Works, which supplied power to nine factories within a radius of six miles. This was the first electric power supplied for tea manufacture in India.
Qāsem Sultan was a member of the Imānlū branch of the Afshar tribe, one of the original Qizilbash tribes that had supplied power to the Safavids since its earliest days. During King Abbas I's early reign, Qāsem Sultan became the head of a group of Afshars whose duty it was to protect the marshes surrounding the city of Kermanshah. In the early 17th century, marked by wars against the archrivals of the Safavids — the Ottomans — Qāsem Sultan fought with great distinction, which earned him the governorshop of Mosul in 1622. However, shortly after, following the outbreak of a plague, he moved towards the western part of Azerbaijan with the rest of his tribe.
It has been closed for about 100 years and a story still exists that an Excise officer from Omagh paid a visit to it once and he was never seen afterwards. There were two bakeries in Gortin at one time and the owner of one of them was in the habit of hitching up of two horses to the same number of carts and going to Dublin for two loads of flour. Each owner of the bakeries had a horse and bread cart delivering bread over the country. There was also a saw mill driven by a steam engine with the assistance of a windmill which also supplied power to a mill, for grinding Indian corn into meal and crushing oats, and for printing.
Sir John Maria Emilio Gatti (13 August 1872 – 14 September 1929) was an Anglo- Swiss theatre manager, restaurateur and businessman who was also a prominent Conservative politician in London local government. Born as Joannes Maria Aemilius Gatti in Dongio, in the canton of Ticino, Switzerland, he was the eldest son of the entrepreneur Agostino Gatti. The Gatti family had built up a large family business in Westminster, including the Adelphi and Vaudeville Theatres, a string of cafe-restaurants and the Charing Cross and Strand Electricity Supply Corporation Ltd, which supplied power to most of the West End of London. Gatti was educated at Stonyhurst College and St John's College, Oxford, before being called to the bar at the Inner Temple.
The accusations, animosity, gunplay, and expulsions which followed were part of an ongoing struggle throughout Colorado's mining communities which came to be called the Colorado Labor Wars. In 1891, Telluride's L.L. Nunn joined forces with George Westinghouse to build the Ames Hydroelectric Generating Plant, an alternating current power plant, near Telluride. (Nunn's home can be found at the corner of Aspen and Columbia Streets; next door is the home he purchased for the "pinheads" to study hydro-electric engineering.) The plant supplied power to the Gold King Mine 3.5 miles away. This was the first successful demonstration of long-distance transmission of industrial-grade alternating current power and used two 100-hp Westinghouse alternators, one working as a generator producing 3,000 volt, 133 Hertz, single-phase AC, and the other used as an AC motor.
They later supplied power to the Safavids since the dynasty's earliest days. The tribe had several other branches, one of the most prominent ones being the Develu, which often fought against the Qoyunlu. Agha Mohammad Khan was the eldest son of the chieftain of the Qoyunlu clan, Mohammad Hasan Khan Qajar, and the grandson of Fath-Ali Khan Qajar, a prominent aristocrat executed by the orders of Shah Tahmasp II (possibly compelled by Nader Qoli Beg, who came to be known as Nader Shah after usurping the throne of Iran in 1736, marking the foundation of the Afsharid dynasty). Agha Mohammad Khan had several half- brothers and full-brothers: Hossein Qoli Khan, Morteza Qoli Khan, Mostafa Qoli Khan, Reza Qoli Khan, Jafar Qoli Khan, Mehdi Qoli Khan, Abbas Qoli Khan and Ali Qoli Khan.
The new lenders demanded that Westinghouse cut back on what looked like excessive spending on acquisition of other companies, research, and patents.Carlson, W. Bernard (2013). Tesla: Inventor of the Electrical Age, Princeton University Press, page 131Jill Jonnes, Empires of Light: Edison, Tesla, Westinghouse, and the Race to Electrify the World, Random House - 2004, page=29 Workmen with one of the two Westinghouse alternators used in the Ames Hydroelectric AC power installation In 1891 Westinghouse built a hydroelectric AC power plant, the Ames Hydroelectric Generating Plant near Ophir, Colorado. The plant supplied power to the Gold King Mine 3.5 miles away. This was the first successful demonstration of long-distance transmission of industrial- grade alternating current power and used two 100 hp Westinghouse alternators, one working as a generator producing 3000-volt, 133-Hertz, single-phase AC, and the other used as an AC motor.
The Tandy 1000 EX and HX were designed as entry-level IBM-compatible personal computers, and marketed as starter systems for people new to computing. They were offered in a compact, all-in-one chassis that featured a 7.16 MHz 8088 (capable of clocking down to 4.77 MHz), 256 KB of memory (expandable to 640 KB with a PLUS memory expansion board), PCjr- and CGA-compatible Tandy Video graphics controller, a keyboard and, depending on the model, either a single 5.25" 360 KB floppy drive, or one to two 3.5" 720 KB floppy drives. An external floppy drive could be connected to a port on the back. The machine itself supplied power to the external drive, so only Tandy's unit was usable with the EX and HX. The external drive was the standard 360 KB 5.25 inch format; in 1988 a compatible 720 KB 3.5 inch model was offered.
Electric street lighting came to the District of Columbia on October 15, 1881, when the Edison Electric Light Company installed lamps at 15th Street and Pennsylvania Avenue NW, and at 7th Street and Pennsylvania Avenue NW. The Heisler Company, the city's first electric utility, formed in the summer of 1882 and successfully illuminated F Street NW between 9th and 15th Streets. The United States Electric Lighting Company of the District of Columbia was formed in October 1882, took over the Heisler firm, and quickly began laying underground conduits for electric cables throughout the downtown area. But although the firm, at its own expense, erected and supplied power to street lighting along Pennsylvania Avenue, F Street, and a few other roads in the area, the city was slow to adopt the technology. It was not until 1891 that Congress agreed to pay for public lighting, which was installed on Pennsylvania Avenue SE, between 2nd Street SE and the Eastern Branch Bridge.
The Tapoco Project (originally Tallassee Power Company) includes four dams in North Carolina and Tennessee, on the Little Tennessee and Cheoah rivers. The Tapoco Project comprises four developments: Calderwood, Cheoah, Chilhowee, and Santeetlah. The dams supplied power to Alcoa's operations in Alcoa, Tennessee, an aluminum smelting and rolling mill. TVA assists Brookfield Smoky Mountain Hydropower in determining the daily operation levels of the Tapoco developments to best match expected flow releases from Fontana Dam, since TVA's Fontana Dam serves as the primary flow control facility for the lower Little Tennessee River area. Combined, the four developments have a licensed capacity of 380.1 megawatts. Around 1910, Aluminum Company of America began looking at locations to produce hydroelectric power for making aluminum. The company purchased Knoxville Power Company, chartered in 1900. At the end of 1913, Aluminum Company of America bought Tallassee Power Company (chartered in 1905), Western Carolina Power and Transportation, Union Development Company, and Union Power and Water Company.
Water and Light Fountain at the historic Glenarm Power Plant. Designed by Harold H. Lewis in 1938. Pasadena Water and Power Department (PWP) provides services to an area and includes areas outside of the city proper including unincorporated areas of southern Altadena, East Pasadena, Chapman Woods, and East San Gabriel. PWP has operated the Glenarm Power Plant for over 110 years. Pasadena created the Pasadena Municipal Light and Power Department in 1906. On May 3, 1906, a $125,000 bond was issued to pay for the construction of a power plant. This first power plant was a wood frame and corrugated sheet iron structure which housed one 200-kW Crocker- Wheeler generator driven by a Fleming-Corliss engine, one 200-pound pressure boiler, a condenser, pumps, and other auxiliary equipment and only supplied power to the city's street lights. Expanding continued and more generating capacity was expanded and the city then offered power to commercial customers in 1908, and bought out Southern California Edison's Pasadena operations in 1920.
Poe agreed with Santiago's comment that EDCA should pass first in the Senate, adding that she seeks to strengthen the Armed Forces, comparing it to Singapore's modernized military, and wants talks to China and the ASEAN constructively regarding the South China Sea dispute, which Santiago also wanted. Poe supported transparent and inclusive Mindanao peace talks and a formal peace covenant including all sectors, such as the MILF, MNLF, tribal groups, indigenous people, and the Christians in Mindanao. She also mentioned her plan to build a 70 billion-peso railway system in Mindanao and supported devolution of powers in the local government, an expanded budget for road infrastructure and tourism projects to provide jobs, and solving problems in electricity in Mindanao through the rehabilitation of Angus-Pulangi Dam and Hydroelectric Power Plant, which supplied power to much of Mindanao. Duterte reacts that there is a great threat in Mindanao, after the Bangsamoro Basic Law (BBL) failed to pass in the 15th Congress.
The New Haven line of the New York, New Haven and Hartford Railroad ran commuter trains into the city, and electrification all the way to New Haven would avoid massive congestion and delays to commuter trains if locomotives were changed at the New York City limits or at Stamford, CT. The "New Haven" chose AC electrification as proposed by Baldwin- Westinghouse, with locomotives which could operate on the third-rail DC system within city limits, and the AC system on the main line. The plant was built by Westinghouse in 1907 in Mission Style, and was located where the Mianus River empties into the Cos Cob Harbor of Long Island Sound. The plant used coal- fired steam turbines, and the three-phase alternators supplied single-phase power at 11 kV 25 Hz directly to the catenary. They also supplied power to the New York Central's Port Morris generating station to compensate the NYC for power consumed by New Haven trains on the NYC's third-rail supplied line to the Grand Central Terminal within the city limits.
The first Portishead power station was built by Bristol Corporation's Electricity Department, as their earlier power stations in Bristol – the first at Temple Back (opened 1891) and the second at the Feeder Canal – became inadequate to meet demand.Winter (2005), pages 11-18. Construction at Portishead Dock started in 1926 and the station began generating electricity in 1929.Crowhurst (2001). Chapter 4: Portishead at Work. With the creation of the Central Electricity Board (CEB) in 1926 and the establishment of the 132 kV National Grid, Portishead Power station, when it opened, remained under the day-to-day control of Bristol Corporation but was also subject to control by the CEB. It supplied power to the gridHannah (1979). and in 1931 its installed capacity was advertised as being in excess of .Winter (2005), "Bristol Corporation Electricity Department advertisement", Page 19. In 1937 its original six short chimney stacks were replaced by a high stack. In 1948, the British Electricity Authority (BEA) was established, with the nationalisation of the UK's electricity supply industry, through the authority of the Electricity Act 1947. The BEA took over the operations of over 600 private power companies and local council power stations to form 14 area boards.
The captain of the vessel staunchly denied the claims. No arrests were made and the small dinghy remained with the Marsh at least until 1947. She then sailed for Guam where she received orders for Tsingtao and Fusan, Korea where the 7th Fleet lent support to the aims of American policy in China and in the United States occupation zone of Korea. Marsh returned to her home port, Pearl Harbor, on 31 March 1947, and for the next three years, operated in the Hawaiian Islands and off the coast of California, deploying in 1948 for two months duty at Eniwetok. Her next Pacific deployment came after the invasion of South Korea by the Communists in June 1950. Marsh arrived at Yokosuka, Japan on 7 September, and departed on the 14th for Pusan, where she supplied power to the city for two weeks. On 9 October, she entered Inchon Harbor, and remained as support for that area's defense until the end of the month. She supplied power at Masan, a seaport on Chosen Strait, for a month starting on 9 November, then returned to Pusan where she remained as a ship-to-shore power unit for the remainder of her tour.

No results under this filter, show 81 sentences.

Copyright © 2024 RandomSentenceGen.com All rights reserved.