Sentences Generator
And
Your saved sentences

No sentences have been saved yet

12 Sentences With "increase of speed"

How to use increase of speed in a sentence? Find typical usage patterns (collocations)/phrases/context for "increase of speed" and check conjugation/comparative form for "increase of speed". Mastering all the usages of "increase of speed" from sentence examples published by news publications.

With 5G launching around the world this year, carriers, phone makers and consumers alike have yet to develop a killer app for the massive increase of speed provided by 5G.
2 EPBs near Sevenoaks in 1958. British Railways started to implement its 1955 Modernisation Plan. This extended electrification to the Kent Coast in two stages, with the South Eastern Main Line being subject of "Kent Coast Electrification - Stage 2". As part of Stage 1, Chislehurst Jn was rebuilt to allow an increase of speed on the connecting lines from to .
Over the next 5K, the pace gradually increased, losing the defending champion Stephen Kiprotich and reigning world champion Ghirmay Ghebreslassie, though Ghebreslassie was hanging on off the back. At 30K there were only 8 still running together at the front. Lemi Berhanu seemed to be leading the increase of speed, calling back for his teammate Feyisa Lilesa to keep up. Within 2 km, the lead pack was down to four, the two Ethiopians, Kipchoge and Galen Rupp.
Investigators initially blamed the accident on Polikarpov's deputy Zhemchuzhin, who allegedly failed to fit the balance weights into the leading edges of the ailerons, causing wild flutter. Later they also blamed Lipkin, already dead, for the alleged reckless increase of speed. TsAGI engineers and airfield staff voiced suspicion that other factors could have been involved, but these were not examined at all. The third prototype, piloted by Kudrin, lost horizontal trim tab in flight; the pilot managed to land the plane but refused to fly on SPB (D) prototypes anymore.
Like Quincy and Astoria, Vincennes also sighted the aerial flares to the south, and furthermore, actually sighted gunfire from the southern engagement. At 01:50, when the U.S. cruisers were illuminated by the Japanese searchlights, Vincennes hesitated to open fire, believing that the searchlight's source might be friendly ships. Shortly thereafter, Kako opened fire on Vincennes which responded with her own gunfire at 01:53. As Vincennes began to receive damaging shell hits, her commander, U.S. Captain Frederick L. Riefkohl, ordered an increase of speed to , but shortly thereafter, at 01:55, two torpedoes from Chōkai hit, causing heavy damage.
The task of refitting The Caledonia, building and installing new engines and boilers and making her seaworthy and efficient in fuel consumption was a difficult process and Murdoch, although frequently suffering from fever and rheumatism, directed this. By August the vessel was able to be tested on its intended route, from Surrey Commercial Docks, London to Gravesend and at first made 8 miles per hour (mph). During its sea trials Murdoch carried out experiments on The Caledonia to measure the effect on fuel consumption and speed of changes in the depth of the paddles and whether one or both engines were used. This resulted in an increase of speed to .
By the 1950s the route was in bad conditions due to two main reasons: according to the law which regulated the traffic of vehicles in Argentina, the speed limit was 80 km/h for cars and 50 km/h for trucks; 20 years later, trucks passed at 80 km/h and the road was not prepared for this increase of speed because materials used for its construction were not resistant enough. Another cause that contributed to deterioration of route 2 was that the number of vehicles using the road had tripled within 20 years. For those reasons, the government invited tenders for the restoration of the road, which took two years of work, from 1956 to 1959. The route was widened to .
For example, the USAID (agency for international development) EPT (Emerging Pandemic Threats) PREDICT project is included in this plan and it is focused on the study of the biology of some dangerous viruses, such as Ebola, Lassa fever, Rift Valley fever and avian influenza. PREDICT project was founded also to discover new viral species in the animal reservoir host and individuate the main characteristics that can cause the viral transmission to human, to avoid the viral outbreak in the population. Next-generation sequencing can help the massive sequencing of this viral genome samples collected, allowing the increase of speed and efficiency and moreover reducing the cost of sequencing. To validate the possibility for these new-discovered viruses to be transmitted from animal to human, new approaches must be developed for the study of their pathogenicity.
The overall project cost was JPY 11,020 million, or 18% less than the budgeted cost. The overall results of the project included a reduction in running hours from one end of the line to the other (from 36 hours in 1994 to 29 hours in 2007); an increase of speed limits on rehabilitated bridges (from to ), which contributed to the reduction in running hours; and a reduction in the number of railway accidents throughout the line. North–South Railway, in Da Nang. In 2007, Vietnam Railways awarded an additional VND 150 billion (US$9.5 million) five-year contract for consultancy services to Japan Transportation Consultants, the Pacific Consultants International Group, and the Japan Railway Technical Service (Jarts), regarding a VND 2.47 trillion project to further improve bridge and railway safety on the North–South line.
Later from Addis Ababa there were three flights a week that continued to Mogadishu, capital of Italian Somalia. The most important railway line in the African colonies of the Kingdom of Italy, the 784 km long Franco-Ethiopian Railway, was seized following the conquest of Ethiopia in 1936. The route was served until 1935 by steam trains that took about 36 hours to do the total trip between the capital of Ethiopia and the port of Djibouti. Following the Italian conquest was obtained in 1938 the increase of speed for the trains with the introduction of four railcars high capacity "type 038" derived from the model Fiat ALn56.Fiat ALn56 "Littorina" These diesel trains were able to reach 70 km/h and cutting time travel in half to just 18 hours: they were used until the mid 1960s.
The overall results of the project included a reduction in running hours from one end of the line to the other (from 36 hours in 1994 to 29 hours in 2007); an increase of speed limits on rehabilitated bridges (from to , which contributed to the reduction in running hours; and a reduction in the number of railway accidents throughout the line. In 2007, Vietnam Railways awarded an additional VND 150 billion (US$9.5 million) five-year contract for consultancy services to Japan Transportation Consultants, the Pacific Consultants International Group, and the Japan Railway Technical Service (Jarts), regarding a VND 2.47 trillion project to further improve bridge and railway safety on the North–South line. The project's goals include the refurbishment of 44 bridges and of railway tracks, the building of two new railway bridges and a new railway station at Ninh Bình, and the purchase of 23 track machines.
The roller and underside of a rocker-roller board Thus, the rider stimulates, exercises and teaches the parts of the body that implement the act of balancing (toes, soles, ankles, knees, hips, shoulders, arms and neck) and the parts of the body and brain that create the sense of balance and that engineer the implementation of the act of balancing (inner ears, cerebellum, proprioceptors and eyes). Video of a wobble board's instability The degrees of movement through which the board can move – sliding, pivoting, rotating, tilting, rolling or some combination of those – and the speed of the board differ in different types and subtypes of models, depending on the shape and size of the fulcrum, whether it is attached to the board and, if it isn't attached, the method(s) by which it is constrained by the board, if any. With an increase of speed and with each additional degree of movement through which one model or another can move, the need to avoid losing control of the board forces the rider to exercise considerably more skill in order to avoid falling. The underside of a sphere-and-ring board In rocker boards and wobble boards, the fulcrum is attached to the board.

No results under this filter, show 12 sentences.

Copyright © 2024 RandomSentenceGen.com All rights reserved.